Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,525

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0112 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,660 $520 Implemented
AR0112 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,364 $100 Implemented
AR0112 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $2,179 $5,400 Implemented
AR0112 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,399 $157 Not Implemented
AR0112 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,214 $6,200 Implemented
AR0112 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,010 $0 Not Implemented
AR0112 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $279 Implemented
AR0112 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $14,497 $6,000 Not Implemented
AR0112 # 09 Y:1997 09 1997 RECYCLE CLEANING SOLVENT AND REUSE $1,720 $6,000 Not Implemented
AR0112 # 10 Y:1997 10 1997 AUTOMATE FINISHING PROCESS $60,000 $15,000 Not Implemented
WI0289 # 01 Y:1997 01 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,900 $0 Implemented
WI0289 # 02 Y:1997 02 1997 ADOPT IN-HOUSE MATERIAL GENERATION $12,690 $0 Implemented
WI0289 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,496 $11,150 Not Implemented
WI0289 # 04 Y:1997 04 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,349 $22,000 Not Implemented
WI0289 # 05 Y:1997 05 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,780 $34,425 Not Implemented
WI0289 # 06 Y:1997 06 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,430 $0 Implemented
WI0289 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,219 $150 Implemented
WI0289 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $640 Not Implemented
WI0289 # 09 Y:1997 09 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,541 $5,000 Implemented
WI0288 # 01 Y:1997 01 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,567 $500 Implemented
WI0288 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,058 $0 Implemented
WI0288 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,683 $7,800 Not Implemented
WI0288 # 04 Y:1997 04 1997 USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS $1,240 $1,000 Not Implemented
WI0288 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,064 $640 Not Implemented
WI0288 # 06 Y:1997 06 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,008 $5,000 Implemented