IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0702 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,630 $950 n/a
CO0702 # 01 Y:2015 01 2015 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,850 $20,000 n/a
CO0702 # 04 Y:2015 04 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,480 $500 n/a
CO0702 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,680 $42,100 n/a
CO0628 # 07 Y:2009 07 2009 USE PHOTOCELL CONTROLS $1,920 $210 Not Implemented
CO0628 # 03 Y:2009 03 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $110 Not Implemented
CO0628 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,830 $890 Implemented
CO0628 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,150 $4,590 Implemented
CO0628 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,150 $1,360 Not Implemented
CO0628 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,050 $1,730 Implemented
CO0628 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $21,150 Implemented
CO0628 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,830 $12,240 Implemented
CO0507 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,700 $330 Implemented
CO0507 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,940 $68,900 Not Implemented
CO0507 # 06 Y:2002 06 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,540 $160 Not Implemented
CO0507 # 03 Y:2002 03 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,150 $7,000 Implemented
CO0507 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $817 $1,358 Implemented
CO0507 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,120 $15,380 Implemented
CO0496 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0496 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $104,330 $20,000 Not Implemented
CO0496 # 06 Y:2001 06 2001 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $68,550 $3,360 Not Implemented
CO0496 # 07 Y:2001 07 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $12,610 $0 Not Implemented
CO0496 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,120 $12,000 Not Implemented
CO0496 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $5,260 Not Implemented
CO0496 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,240 $220 Not Implemented