IAC logo
IAC Assessment: CO0496
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product metal furniture
NAICS n/a
SIC 2522 - Office Furniture, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 149
Plant Area (Sq.Ft.) 90,000
Annual Production 800,000,000 Pounds
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,711 2,958,785 kWh $0.02
Electricity Demand $82,073 6,281 kW-months/year $13.07
Electricity Fees $192 - $ -
Natural Gas $114,980 19,471 MMBtu $5.91
TOTAL ENERGY COSTS $275,679
RECOMMENDED SAVINGS* $197,600 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,120
Cost:
$12,000
- - $8,120 624 - - - - - - - - - - -
-
kWh
$8,120
624
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,560
Cost:
$5,260
- - - - $2,560 491 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,560
491
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,240
Cost:
$220
$960 59,500 $1,060 82 - - - - $(-780) - - - - - $960
59,500
kWh
$1,060
82
kW-months/year
-
-
MMBtu
-
-
lb
$(-780)
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$190
Cost:
-
$1,160 72,100 $2,780 213 - - - - $(-1,530) - - - $(-2,220) - $1,160
72,100
kWh
$2,780
213
kW-months/year
-
-
MMBtu
-
-
lb
$(-1,530)
-
$
-
-
$
$(-2,220)
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$104,330
Cost:
$20,000
- - - - - - $330 26,000 - - - - $104,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$330
26,000
lb
-
-
$
-
-
$
$104,000
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$68,550
Cost:
$3,360
- - - - - - $310 24,350 - - - - $68,240 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$310
24,350
lb
-
-
$
-
-
$
$68,240
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$12,610
Cost:
-
- - - - - - - - - - $12,610 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$12,610
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$197,600
Cost:
$40,840
$2,120 131,600 $11,960 919 $2,560 491 $640 50,350 $(-2,310) - $12,610 - $170,020 - $2,120
131,600
kWh
$11,960
919
kW-months/year
$2,560
491
MMBtu
$640
50,350
lb
$(-2,310)
-
$
$12,610
-
$
$170,020
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost