Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2001 |
Principal Product | metal furniture |
NAICS | n/a |
SIC | 2522 - Office Furniture, Except Wood |
Sales | $10,000,000-$50,000,000 |
# of Employees | 149 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 800,000,000 Pounds |
Production Hrs. Annual | 4,420 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,711 | 2,958,785 | kWh | $0.02 |
Electricity Demand | $82,073 | 6,281 | kW-months/year | $13.07 |
Electricity Fees | $192 | - | $ | - |
Natural Gas | $114,980 | 19,471 | MMBtu | $5.91 |
TOTAL ENERGY COSTS | $275,679 | |||
RECOMMENDED SAVINGS* | $197,600 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $8,120 Cost: $12,000 |
- | - | $8,120 | 624 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$8,120 624 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,560 Cost: $5,260 |
- | - | - | - | $2,560 | 491 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,560 491 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,240 Cost: $220 |
$960 | 59,500 | $1,060 | 82 | - | - | - | - | $(-780) | - | - | - | - | - |
$960 59,500 kWh |
$1,060 82 kW-months/year |
- - MMBtu |
- - lb |
$(-780) - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $190 Cost: - |
$1,160 | 72,100 | $2,780 | 213 | - | - | - | - | $(-1,530) | - | - | - | $(-2,220) | - |
$1,160 72,100 kWh |
$2,780 213 kW-months/year |
- - MMBtu |
- - lb |
$(-1,530) - $ |
- - $ |
$(-2,220) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $104,330 Cost: $20,000 |
- | - | - | - | - | - | $330 | 26,000 | - | - | - | - | $104,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$330 26,000 lb |
- - $ |
- - $ |
$104,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $68,550 Cost: $3,360 |
- | - | - | - | - | - | $310 | 24,350 | - | - | - | - | $68,240 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$310 24,350 lb |
- - $ |
- - $ |
$68,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $12,610 Cost: - |
- | - | - | - | - | - | - | - | - | - | $12,610 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$12,610 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $197,600 Cost: $40,840 |
$2,120 | 131,600 | $11,960 | 919 | $2,560 | 491 | $640 | 50,350 | $(-2,310) | - | $12,610 | - | $170,020 | - | $2,120 131,600 kWh |
$11,960 919 kW-months/year |
$2,560 491 MMBtu |
$640 50,350 lb |
$(-2,310) - $ |
$12,610 - $ |
$170,020 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |