IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0005 # 07 Y:2012 07 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $982 $3,646 Implemented
WM0005 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $27,546 $9,000 Not Implemented
WM0005 # 05 Y:2012 05 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,321 $95 Implemented
WM0005 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $2,000 Implemented
WM0005 # 03 Y:2012 03 2012 INSTALL SKYLIGHTS $2,119 $4,205 Not Implemented
WM0005 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,819 $200 Implemented
WM0005 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,565 $1,150 Not Implemented
BD0390 # 07 Y:2011 07 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $510 Not Implemented
BD0390 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,595 $4,000 Implemented
BD0390 # 02 Y:2011 02 2011 INSTALL TURBULATORS $2,436 $2,500 Implemented
BD0390 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,012 $21,240 Implemented
BD0390 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $434 $237 Implemented
BD0390 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $500 Implemented
BD0390 # 04 Y:2011 04 2011 USE SYNTHETIC LUBRICANT $453 $300 Not Implemented
BD0380 # 06 Y:2010 06 2010 USE SYNTHETIC LUBRICANT $873 $600 Not Implemented
BD0380 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,928 $11 Implemented
BD0380 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,388 $3,780 Not Implemented
BD0380 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,119 $1,500 Not Implemented
BD0380 # 08 Y:2010 08 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,554 $2,750 Not Implemented
BD0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $15,800 $18,200 Not Implemented
BD0380 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $748 $21 Not Implemented
BD0380 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,681 $420 Not Implemented
BD0290 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,277 $15,080 Implemented
BD0290 # 15 Y:2005 15 2005 METER WASTE WATER $728 $250 Implemented
BD0290 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,841 $9,598 Implemented