IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1913 # 10 Y:2019 10 2019 OPTIMIZE PLANT POWER FACTOR $15,097 $10,570 Implemented
UK1913 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,855 $2,510 Implemented
UK1913 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $5,474 $16,000 Not Implemented
UK1913 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,642 $2,520 Implemented
UK1913 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,111 $550 Implemented
UK1913 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $632 $62 Not Implemented
UK1913 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $333 $1,120 Implemented
UK1913 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,770 $32,561 Implemented
UK1913 # 08 Y:2019 08 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $127 Implemented
UK1913 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $8,076 $3,569 Not Implemented
TT0028 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,930 $10,100 Not Implemented
TT0028 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $2,500 Not Implemented
TT0028 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,360 $12,000 Not Implemented
TT0028 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,060 $10,060 Not Implemented
TT0028 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,250 $256,400 Not Implemented
TT0028 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $920 $1,500 Not Implemented
TT0028 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $5,033 $23,900 Not Implemented
TT0028 # 06 Y:2008 06 2008 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $993,250 $4,000,000 Not Implemented
TT0028 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,570 $2,000 Not Implemented
UL0208 # 02 Y:1998 02 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $35,850 $0 Not Implemented
UL0208 # 04 Y:1998 04 1998 $60,000 $20,000 Not Implemented
UL0208 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,060 $0 Not Implemented
UL0208 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $33,960 $0 Not Implemented
UL0146 # 04 Y:1996 04 1996 RECOVER AND REUSE WASTE MATERIAL $12,300 $12,500 n/a
UL0146 # 05 Y:1996 05 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $450 $0 n/a