IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0184 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $350 Implemented
ME0184 # 09 Y:1996 09 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $209 $100 Implemented
ME0184 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $449 $1,000 Implemented
ME0184 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,687 $100 Implemented
ME0184 # 05 Y:1996 05 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,068 $0 Implemented
ME0184 # 04 Y:1996 04 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,716 $0 Implemented
ME0184 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,212 $930 Implemented
ME0184 # 02 Y:1996 02 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,210 $8,250 Implemented
ME0184 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,017 $11,793 Implemented
ME0184 # 10 Y:1996 10 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,600 $0 Implemented
ME0171 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,073 $1,495 Not Implemented
ME0171 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $14,688 $1,600 Implemented
ME0171 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $587 $300 Implemented
ME0171 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $903 $300 Implemented
ME0171 # 05 Y:1995 05 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $957 Not Implemented
ME0171 # 03 Y:1995 03 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,447 $20,000 Implemented
ME0171 # 02 Y:1995 02 1995 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,951 $3,480 Not Implemented
ME0171 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $4,384 $0 Implemented
ME0169 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,475 $1,000 Not Implemented
ME0169 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,341 $28,606 Not Implemented
ME0169 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,642 $1,200 Not Implemented
ME0169 # 09 Y:1995 09 1995 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $0 $0 Not Implemented
ME0169 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,520 $0 Not Implemented
ME0169 # 06 Y:1995 06 1995 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,205 $400 Implemented
ME0169 # 03 Y:1995 03 1995 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $18,499 $75,000 Not Implemented