IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0186 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $38,730 $4,000 Not Implemented
TT0186 # 01 Y:2017 01 2017 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $684,912 $1,500,000 Not Implemented
TT0186 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $587 $1,123 Not Implemented
TT0186 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,574 $5,800 Implemented
TT0186 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $543 $200 Not Implemented
TT0186 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $12,015 $33,000 Implemented
TT0186 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $78,651 $90,000 Implemented
TT0108 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,126 $10,709 Implemented
TT0108 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,110 $1,110 Not Implemented
TT0108 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $980 Implemented
TT0108 # 02 Y:2013 02 2013 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $5,367 $8,075 Not Implemented
MZ0102 # 06 Y:2012 06 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,370 $2,270 Implemented
MZ0102 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $930 $700 Implemented
MZ0102 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,776 $10,060 Not Implemented
MZ0102 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,326 $16,800 Implemented
MZ0102 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,444 $0 Implemented
MZ0102 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,327 $2,000 Implemented
AR0191 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $1,877 Implemented
AR0191 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $95,071 $13,210 Implemented
AR0191 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $582 $0 Not Implemented
AR0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,105 $1,590 Not Implemented
AR0191 # 04 Y:2000 04 2000 USE MAGNETIC TECHNOLOGY TO TREAT WATER $12,000 $10,374 Implemented
AR0191 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $74,880 $80,000 Not Implemented
TN0658 # 02 Y:1999 02 1999 RECOVER AND REUSE WASTE MATERIAL $120,000 $2,400 Not Implemented
TN0658 # 01 Y:1999 01 1999 BURN WOOD BY-PRODUCTS FOR HEAT $194,600 $52,000 Not Implemented