IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,628

matching recommendations
Reset
SIC 251 Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0232 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,625 $22,658 n/a
WM0232 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $2,750 n/a
WM0232 # 01 Y:2025 01 2025 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,149 $46,220 n/a
WM0232 # 03 Y:2025 03 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,500 $360 n/a
WM0232 # 05 Y:2025 05 2025 INSTALL OCCUPANCY SENSORS $778 $800 n/a
GT0979 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,122 $800 n/a
GT0979 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $105,447 $2,259,869 n/a
GT0979 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,807 $1,850 n/a
GT0979 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,666 $200 n/a
GT0979 # 02 Y:2024 02 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $26,554 $800 n/a
GT0979 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $148 $100 n/a
LE0568 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,295 $12,500 Implemented
LE0568 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,890 $200 Implemented
LE0568 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $684 $950 Not Implemented
LE0568 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $1,730 $1,215 Implemented
LE0568 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,304 $0 Implemented
LE0568 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,779 $78,580 Not Implemented
LE0568 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,155 $1,400 Implemented
LE0568 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $6,769 $1,120 Implemented
LE0568 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,570 $9,661 Implemented
CC0031 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,115 $205,795 n/a
CC0031 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,100 $3,000 n/a
CC0031 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,751 $0 n/a
CC0031 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $147 $340 n/a
CC0031 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,525 $19,500 n/a