Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 251 | Household Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0604 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,442 | $1,900 | Not Implemented |
OK0604 # 01 Y:2000 | 01 | 2000 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,686 | $4,275 | Implemented |
OK0604 # 05 Y:2000 | 05 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $70,200 | $47,500 | Implemented |
OK0604 # 03 Y:2000 | 03 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $24,537 | $26,122 | Not Implemented |
OK0604 # 04 Y:2000 | 04 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $18,577 | $1,801 | Implemented |
MS0167 # 01 Y:2000 | 01 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,673 | $3,114 | Not Implemented |
MS0167 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,327 | $151 | Implemented |
MS0167 # 02 Y:2000 | 02 | 2000 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,379 | $11,435 | Not Implemented |
MS0167 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $1,698 | $1,845 | Not Implemented |
MS0167 # 05 Y:2000 | 05 | 2000 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $757 | $217 | Implemented |
CO0472 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $370 | Implemented |
CO0472 # 01 Y:2000 | 01 | 2000 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,280 | $12,550 | Implemented |
CO0472 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,960 | $200 | Not Implemented |
CO0472 # 07 Y:2000 | 07 | 2000 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $35,000 | $1,600 | Implemented |
CO0472 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Not Implemented |
CO0472 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $410 | $1,020 | Implemented |
CO0472 # 03 Y:2000 | 03 | 2000 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,040 | $1,000 | Implemented |
GT0697 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,385 | $46,235 | Implemented |
GT0697 # 02 Y:2000 | 02 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,208 | $4,355 | Not Implemented |
GT0697 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,700 | $37,500 | Not Implemented |
GT0697 # 04 Y:2000 | 04 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $38,825 | $600 | Implemented |
GT0697 # 05 Y:2000 | 05 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,825 | $2,850 | Implemented |
GT0697 # 06 Y:2000 | 06 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,480 | $26,340 | Not Implemented |
GT0697 # 07 Y:2000 | 07 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,000 | $3,800 | Implemented |
GT0697 # 08 Y:2000 | 08 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,770 | $900 | Not Implemented |