IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

667

matching recommendations
Reset
SIC 2511 Wood Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0019 # 07 Y:1991 07 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,331 $1,100 Implemented
AS0014 # 01 Y:1990 01 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,519 $8,333 Not Implemented
AS0014 # 02 Y:1990 02 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,462 $0 Implemented
AS0014 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,538 $2,485 Implemented
AS0014 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,783 $1,000 Implemented
AS0014 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,037 $200 Not Implemented
AS0014 # 06 Y:1990 06 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,256 $1,000 Implemented
AS0014 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,918 $60,000 Not Implemented
TN0399 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,222 $2,750 Implemented
TN0399 # 02 Y:1990 02 1990 REDUCE VENTILATION AIR $5,547 $5,692 Not Implemented
TN0399 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $825 $687 Implemented
TN0399 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,844 $900 Implemented
TN0399 # 05 Y:1990 05 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,555 $16,100 Not Implemented
TN0399 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,873 $185 Implemented
TN0399 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $96 Implemented
TN0399 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $813 $680 Implemented
TN0399 # 09 Y:1990 09 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $583 $210 Implemented
TN0399 # 10 Y:1990 10 1990 OPTIMIZE PLANT POWER FACTOR $4,690 $5,900 Not Implemented
TN0401 # 01 Y:1990 01 1990 BURN WOOD BY-PRODUCTS FOR HEAT $15,125 $58,640 Not Implemented
TN0401 # 02 Y:1990 02 1990 CLOSE OFF UNNEEDED STEAM LINES $3,385 $0 Implemented
TN0401 # 03 Y:1990 03 1990 REPAIR AND ELIMINATE STEAM LEAKS $2,853 $770 Implemented
TN0401 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,117 $30,000 Implemented
TN0401 # 05 Y:1990 05 1990 KEEP LAMPS AND REFLECTORS CLEAN $9,859 $28,302 Not Implemented
TN0401 # 06 Y:1990 06 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,021 $1,140 Implemented
TN0401 # 07 Y:1990 07 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $978 $200 Implemented