Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2515 Mattresses And Bedsprings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0446 # 09 Y:2012 09 2012 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $28,690 $71,725 Not Implemented
NC0446 # 08 Y:2012 08 2012 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,979 $8,800 Not Implemented
NC0446 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,560 $100 Implemented
NC0446 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,188 $0 Not Implemented
NC0446 # 05 Y:2012 05 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $44,845 $120,000 Not Implemented
NC0446 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,073 $4,900 Implemented
NC0446 # 01 Y:2012 01 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $171,632 $1,063,000 Not Implemented
NC0446 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $92,397 $210,000 Not Implemented
NC0446 # 03 Y:2012 03 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $108,281 $84,000 Not Implemented
NC0415 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $937 $50 Not Implemented
NC0415 # 07 Y:2010 07 2010 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,000 $15,750 Implemented
NC0415 # 06 Y:2010 06 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,000 $1,000 Implemented
NC0415 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $911 $1,846 Implemented
NC0415 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $146 $50 Implemented
NC0415 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,465 $500 Not Implemented
NC0415 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,456 $3,200 Implemented
OD0132 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $713 $50 Not Implemented
OD0132 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $702 $190 Not Implemented
OD0132 # 03 Y:1999 03 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,459 $0 Not Implemented
OD0132 # 04 Y:1999 04 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,114 $0 Not Implemented