IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

618

matching recommendations
Reset
SIC 252 Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0180 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $135 $3,650 Not Implemented
UL0180 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $2,813 Implemented
UL0180 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $526 $87 Not Implemented
UL0180 # 04 Y:1997 04 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,150 $0 Implemented
UL0180 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,000 $17,500 Implemented
UL0180 # 06 Y:1997 06 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $19,400 $3,600 Implemented
TN0600 # 01 Y:1997 01 1997 MODIFY CURRENT INCENTIVE PROGRAM $105,000 $10,000 Not Implemented
TN0600 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $62,970 $9,000 Implemented
TN0600 # 03 Y:1997 03 1997 ELIMINATE THIRD SHIFT $20,340 $4,000 Implemented
TN0600 # 04 Y:1997 04 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $6,580 $0 Not Implemented
TN0600 # 05 Y:1997 05 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $9,100 $3,775 Not Implemented
TN0600 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,925 $6,000 Not Implemented
TN0600 # 07 Y:1997 07 1997 INSULATE BARE EQUIPMENT $3,140 $410 Not Implemented
TN0600 # 08 Y:1997 08 1997 OPTIMIZE PLANT POWER FACTOR $2,500 $5,675 Implemented
TN0600 # 09 Y:1997 09 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,360 $2,590 Implemented
TN0600 # 10 Y:1997 10 1997 INSTALL TIMERS AND/OR THERMOSTATS $985 $535 Not Implemented
AS0194 # 01 Y:1996 01 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,241 $8,900 Not Implemented
AS0194 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,786 $0 Not Implemented
AS0194 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $280 Implemented
AS0194 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,142 $1,692 Implemented
AS0194 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,022 $3,280 Implemented
AS0194 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $852 $680 Implemented
AS0194 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $571 $750 Not Implemented
AS0194 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $510 Implemented
AS0194 # 09 Y:1996 09 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,256 $0 Implemented