Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
618
matching recommendationsSIC | 252 | Office Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0521 # 04 Y:2018 | 04 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,084 | $2,146 | Implemented |
SF0521 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,444 | $3,798 | Implemented |
SF0521 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $130 | $44 | Implemented |
SF0521 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,001 | $1,610 | Implemented |
GT0913 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,944 | $624 | Not Implemented |
GT0913 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $29,561 | $5,341 | Not Implemented |
GT0913 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $41,820 | $8,622 | Not Implemented |
GT0913 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $59,508 | $93,857 | Not Implemented |
GT0913 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,257 | $68,584 | Not Implemented |
GT0913 # 06 Y:2018 | 06 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $42,029 | $79,672 | Not Implemented |
GT0913 # 07 Y:2018 | 07 | 2018 | USE SOLAR HEAT FOR HEAT | $77,046 | $500,799 | Not Implemented |
NC0607 # 06 Y:2018 | 06 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,097 | $5,865 | Implemented |
NC0607 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $468 | $1,500 | Implemented |
NC0607 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,655 | $10,125 | Implemented |
NC0607 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $487 | $200 | Implemented |
NC0607 # 02 Y:2018 | 02 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $805 | $1,000 | Implemented |
NC0607 # 01 Y:2018 | 01 | 2018 | INSTALL OCCUPANCY SENSORS | $436 | $797 | Implemented |
UM0486 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,932 | $3,000 | n/a |
UM0486 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $896 | $2,400 | n/a |
UM0486 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,120 | $18,000 | n/a |
UM0486 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $342 | $1,500 | n/a |
NC0591 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,408 | $87,579 | Implemented |
NC0591 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,501 | $4,590 | Implemented |
NC0591 # 03 Y:2017 | 03 | 2017 | USE PHOTOCELL CONTROLS | $52 | $100 | Implemented |
NC0591 # 04 Y:2017 | 04 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $9,474 | $24,000 | Implemented |