IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

618

matching recommendations
Reset
SIC 252 Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0391 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,180 $2,800 Not Implemented
SU0391 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $716 $367 Implemented
SU0391 # 01 Y:2015 01 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $9,598 $5,243 Implemented
AM0683 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,680 $8,610 Not Implemented
AM0683 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,280 $10 Implemented
AM0683 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $1,000 Implemented
AM0683 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $800 $0 Not Implemented
AM0683 # 05 Y:2015 05 2015 USE SYNTHETIC LUBRICANT $390 $0 Implemented
AM0683 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $170 $110 Not Implemented
AM0683 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $0 Implemented
BS0038 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $2,101 $6,300 Not Implemented
BS0038 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,095 $620 Not Implemented
BS0038 # 03 Y:2014 03 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,162 $52,575 Not Implemented
BS0038 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $1,312 $313 Not Implemented
BS0038 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60 $258 Not Implemented
BS0038 # 06 Y:2014 06 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $387 $600 Not Implemented
BS0038 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $26,537 Not Implemented
MA0724 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,321 $1,500 Implemented
MA0724 # 04 Y:2014 04 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,430 $10,000 Not Implemented
MA0724 # 03 Y:2014 03 2014 OPTIMIZE PLANT POWER FACTOR $3,816 $5,322 Not Implemented
MA0724 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,941 $11,100 Not Implemented
MA0724 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,926 $23,600 Implemented
IA0504 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,212 $105 Not Implemented
IA0504 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $12,322 $105 Not Implemented
IA0504 # 03 Y:2013 03 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,346 $3,600 Not Implemented