IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

612

matching recommendations
Reset
SIC 252 Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0094 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,165 $800 Implemented
UA0094 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $4,500 Implemented
UA0094 # 05 Y:2013 05 2013 BURN WOOD BY-PRODUCTS FOR HEAT $290,469 $297,000 Not Implemented
UA0094 # 06 Y:2013 06 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,212 $16,350 Implemented
UA0094 # 07 Y:2013 07 2013 INSULATE BARE EQUIPMENT $7,049 $12,413 Not Implemented
UA0094 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $13,800 $8,100 Implemented
UA0094 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $6,000 $14,980 Not Implemented
UA0045 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,946 $165,576 Not Implemented
UA0045 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,354 $253 Implemented
UA0045 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $53,011 $50,388 Not Implemented
UA0045 # 04 Y:2010 04 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $29,964 $19,014 Not Implemented
UA0045 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $0 Implemented
UA0045 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,672 $740 Not Implemented
UA0045 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $27,056 $4,100 Not Implemented
UA0045 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $5,500 Implemented
UA0045 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,519 $3,616 Not Implemented
UA0045 # 10 Y:2010 10 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,837 $10,250 Not Implemented
DL0020 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,000 $30,000 Not Implemented
DL0020 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $29,300 $125,000 Not Implemented
DL0020 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,000 $13,700 Not Implemented
DL0020 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,334 $34,037 Implemented
DL0020 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $350 Implemented
DL0020 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $63 $130 Not Implemented
UD0772 # 01 Y:2007 01 2007 MODIFY STARTUP/SHUTDOWN TIMES $144,431 $0 Implemented
UD0772 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,082 $161,076 Implemented