IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 252 Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0152 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $492 $132 Not Implemented
AR0152 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $288 $668 Not Implemented
AR0152 # 04 Y:1998 04 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $755 $0 Implemented
AR0152 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,840 $240 Implemented
AR0152 # 06 Y:1998 06 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $9,519 $6,000 Not Implemented
AR0152 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,507 $125 Implemented
AR0152 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $613 $210 Implemented
MS0104 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,224 $1,080 Not Implemented
MS0104 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,962 $27,800 Implemented
MS0104 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $0 Implemented
MS0104 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $5,872 $12,115 Implemented
MS0104 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,499 $3,080 Not Implemented
MS0104 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,476 $54 Implemented
SD0186 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,357 $3,530 Implemented
SD0186 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,716 $0 Not Implemented
SD0186 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,665 $1,180 Not Implemented
SD0186 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,973 $500 Implemented
SD0186 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $928 $1,853 Implemented
SD0186 # 06 Y:1998 06 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,785 $5,115 Implemented
SD0186 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $64,806 $732 Not Implemented
SD0186 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,050 $9,000 Implemented
SD0186 # 09 Y:1998 09 1998 TREAT AND REUSE RINSE WATERS $512 $450 Not Implemented