IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 2521 Wood Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0211 # 06 Y:2002 06 2002 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $48,814 $175,000 Not Implemented
MS0211 # 05 Y:2002 05 2002 DISCONNECT BALLASTS $442 $255 Implemented
MS0211 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $675 $472 Implemented
MS0211 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $864 $2,540 Not Implemented
MS0211 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,516 $577 Implemented
MS0211 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,096 $1,739 Not Implemented
MS0170 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $504 Implemented
MS0170 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,522 $296 Implemented
MS0170 # 03 Y:2000 03 2000 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $29,773 $41,847 Implemented
MS0166 # 07 Y:2000 07 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $29,386 $2,399 Not Implemented
MS0166 # 06 Y:2000 06 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,439 $7,938 Not Implemented
MS0166 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,157 $376 Not Implemented
MS0166 # 04 Y:2000 04 2000 INSTALL TIMERS AND/OR THERMOSTATS $311 $472 Not Implemented
MS0166 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,903 $3,464 Not Implemented
MS0166 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $551 $222 Not Implemented
MS0166 # 01 Y:2000 01 2000 SHUT OFF PILOTS IN STANDBY EQUIPMENT $190 $70 Implemented
MS0044 # 07 Y:1995 07 1995 REDUCE VENTILATION AIR $536 $200 n/a
MS0044 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $234 $202 n/a
MS0044 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $989 $760 n/a
MS0044 # 05 Y:1995 05 1995 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $7,392 $7,500 n/a
MS0044 # 04 Y:1995 04 1995 AIR CONDITION ONLY SPACE NECESSARY $11,011 $10,635 n/a
MS0044 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $593 $2,820 n/a
MS0044 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,785 $0 n/a
MS0044 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,849 $200 n/a
MS0041 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,528 $450 Not Implemented