Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
252
matching recommendationsSIC | 2521 | Wood Office Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0772 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,082 | $161,076 | Implemented |
UD0772 # 06 Y:2007 | 06 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $11,132 | $25,500 | Not Implemented |
UD0772 # 12 Y:2007 | 12 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $530 | $930 | Not Implemented |
UD0772 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,452 | $71,033 | Not Implemented |
UD0772 # 10 Y:2007 | 10 | 2007 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,744 | $600 | Not Implemented |
UD0772 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,068 | $0 | Not Implemented |
UD0772 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,540 | $58,765 | Implemented |
UD0772 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $19,800 | $1,590 | Not Implemented |
UD0772 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,297 | $3,275 | Implemented |
UD0772 # 08 Y:2007 | 08 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $7,421 | $17,000 | Implemented |
UD0772 # 01 Y:2007 | 01 | 2007 | MODIFY STARTUP/SHUTDOWN TIMES | $144,431 | $0 | Implemented |
UD0772 # 04 Y:2007 | 04 | 2007 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $14,325 | $3,260 | Not Implemented |
IC0093 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,595 | $34,679 | Not Implemented |
IC0093 # 07 Y:2004 | 07 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $1,895 | $8,597 | Not Implemented |
IC0093 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $803 | $300 | Not Implemented |
IC0093 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $737 | $0 | Implemented |
IC0093 # 01 Y:2004 | 01 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,168 | $3,600 | Implemented |
IC0093 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,864 | $89,448 | Not Implemented |
IC0093 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,546 | $700 | Implemented |
SU0169 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,846 | $7,106 | Not Implemented |
SU0169 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,040 | $348 | Implemented |
SU0169 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $168 | Implemented |
SU0169 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $26 | Implemented |
SU0169 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,608 | $9,520 | Not Implemented |
SU0169 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Implemented |