Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsSIC | 2522 | Office Furniture, Except Wood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0336 # 05 Y:1999 | 05 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,244 | $6,000 | Not Implemented |
WI0336 # 06 Y:1999 | 06 | 1999 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $5,640 | $11,500 | Not Implemented |
WI0336 # 07 Y:1999 | 07 | 1999 | TREAT AND REUSE RINSE WATERS | $4,813 | $1,600 | Not Implemented |
WI0336 # 08 Y:1999 | 08 | 1999 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,805 | $8,400 | Not Implemented |
WI0336 # 09 Y:1999 | 09 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $576 | $740 | Not Implemented |
MS0104 # 01 Y:1998 | 01 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,476 | $54 | Implemented |
MS0104 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,499 | $3,080 | Not Implemented |
MS0104 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,872 | $12,115 | Implemented |
MS0104 # 04 Y:1998 | 04 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $397 | $0 | Implemented |
MS0104 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $3,224 | $1,080 | Not Implemented |
MS0104 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $13,962 | $27,800 | Implemented |
SD0186 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,357 | $3,530 | Implemented |
SD0186 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,716 | $0 | Not Implemented |
SD0186 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,665 | $1,180 | Not Implemented |
SD0186 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,973 | $500 | Implemented |
SD0186 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $928 | $1,853 | Implemented |
SD0186 # 06 Y:1998 | 06 | 1998 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,785 | $5,115 | Implemented |
SD0186 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $64,806 | $732 | Not Implemented |
SD0186 # 08 Y:1998 | 08 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,050 | $9,000 | Implemented |
SD0186 # 09 Y:1998 | 09 | 1998 | TREAT AND REUSE RINSE WATERS | $512 | $450 | Not Implemented |
MS0020 # 01 Y:1995 | 01 | 1995 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $8,151 | $1,500 | Not Implemented |
MS0020 # 02 Y:1995 | 02 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,400 | $18,000 | Not Implemented |
MS0020 # 03 Y:1995 | 03 | 1995 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,180 | $8,000 | Implemented |
MS0020 # 04 Y:1995 | 04 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,412 | $0 | Implemented |
MS0020 # 05 Y:1995 | 05 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $687 | $2,000 | Not Implemented |