Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
496
matching recommendationsSIC | 254 | Partitions And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0759 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,549 | $40,500 | Not Implemented |
UD0759 # 09 Y:2007 | 09 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $173 | $0 | Not Implemented |
UD0759 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,675 | $0 | Implemented |
UD0759 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $266 | $0 | Not Implemented |
UD0759 # 07 Y:2007 | 07 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $534 | $0 | Not Implemented |
UD0759 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $664 | $500 | Implemented |
UD0759 # 05 Y:2007 | 05 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,440 | $0 | Implemented |
UD0759 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,276 | $0 | Implemented |
UD0759 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,130 | $0 | Implemented |
LM0105 # 05 Y:2006 | 05 | 2006 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $3,978 | $1,000 | Implemented |
LM0105 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,197 | $250 | Implemented |
LM0105 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,156 | $960 | Implemented |
LM0105 # 04 Y:2006 | 04 | 2006 | DEVELOP STANDARD OPERATING PROCEDURES | $48,035 | $1,500 | Implemented |
LM0105 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $638 | $0 | Not Implemented |
MI0115 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,775 | $6,660 | Implemented |
MI0115 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $33,460 | $2,314 | Not Implemented |
MI0115 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,997 | $0 | Implemented |
MI0115 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,743 | $4,732 | Not Implemented |
MI0115 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,435 | $1,074 | Implemented |
MI0115 # 01 Y:2005 | 01 | 2005 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $94,802 | $420 | Implemented |
TA0097 # 01 Y:2005 | 01 | 2005 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $8,253 | $0 | Implemented |
TA0097 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,341 | $1,038 | Implemented |
TA0097 # 02 Y:2005 | 02 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,829 | $176 | Not Implemented |
TA0097 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $2,486 | $270 | Not Implemented |
TA0097 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,277 | $0 | Not Implemented |