IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
SIC 2541 Wood Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0702 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,630 $950 n/a
NC0500 # 13 Y:2013 13 2013 INSTALL OCCUPANCY SENSORS $596 $1,565 Not Implemented
NC0500 # 12 Y:2013 12 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,622 $775 Implemented
NC0500 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $456 $2,704 Not Implemented
NC0500 # 10 Y:2013 10 2013 METER WASTE WATER $4,155 $4,200 Implemented
NC0500 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $286 $750 Not Implemented
NC0500 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,389 $7,000 Implemented
NC0500 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $875 Implemented
NC0500 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,293 $125 Implemented
NC0500 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $100 Implemented
NC0500 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $59,689 $250,000 Not Implemented
NC0500 # 02 Y:2013 02 2013 MAKE A NEW BY-PRODUCT $86,815 $250,000 Implemented
NC0500 # 04 Y:2013 04 2013 REDUCE FLUID FLOW RATES $34,287 $18,000 Implemented
NC0500 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $4,146 $200 Implemented
BD0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $15,800 $18,200 Not Implemented
BD0380 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,928 $11 Implemented
BD0380 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,388 $3,780 Not Implemented
BD0380 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,681 $420 Not Implemented
BD0380 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,119 $1,500 Not Implemented
BD0380 # 08 Y:2010 08 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,554 $2,750 Not Implemented
BD0380 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $748 $21 Not Implemented
BD0380 # 06 Y:2010 06 2010 USE SYNTHETIC LUBRICANT $873 $600 Not Implemented
LE0266 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $751 $300 Not Implemented
LE0266 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,255 $200 Not Implemented
LE0266 # 05 Y:2008 05 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,436 $2,500 Not Implemented