IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

306

matching recommendations
Reset
SIC 2542 Partitions And Fixtures, Except Wood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0546 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $989 $400 Implemented
SD0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,431 $6,068 Implemented
SD0546 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $419 $1,000 Implemented
SD0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,392 $25,659 Implemented
SD0546 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $8,753 $17,253 Implemented
SD0546 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,299 $2,500 Implemented
SD0542 # 07 Y:2017 07 2017 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,935 $1,833 Not Implemented
SD0542 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,069 $31,000 Implemented
SD0542 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $11,288 Implemented
SD0542 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,078 $14,300 Not Implemented
SD0542 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,070 $9,000 Not Implemented
SD0542 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $967 $850 Not Implemented
SD0542 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,740 $1,500 Implemented
SD0542 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,162 $600 Not Implemented
SD0542 # 08 Y:2017 08 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,153 $2,288 Implemented
AM0719 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,350 $1,000 Implemented
AM0719 # 08 Y:2016 08 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $250 $0 Not Implemented
AM0719 # 07 Y:2016 07 2016 KEEP LAMPS AND REFLECTORS CLEAN $390 $57 Implemented
AM0719 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $700 $760 Implemented
AM0719 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $840 $10 Implemented
AM0719 # 04 Y:2016 04 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,440 $2,000 Implemented
AM0719 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,110 $6,410 Implemented
AM0719 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,680 $41,400 Implemented
MZ0169 # 05 Y:2015 05 2015 CONDENSE OPERATION INTO ONE BUILDING $1,574 $0 Implemented
MZ0169 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $209 $300 Not Implemented