IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 2542 Partitions And Fixtures, Except Wood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0287 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $12,300 $8,850 Not Implemented
BD0287 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $13,639 $248 Implemented
BD0287 # 13 Y:2005 13 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $140 Implemented
BD0287 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $564 $600 Implemented
BD0287 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $568 $440 Not Implemented
BD0287 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
BD0287 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $894 $2,500 Implemented
BD0287 # 07 Y:2005 07 2005 INSTALL TURBULATORS $1,486 $2,500 Not Implemented
BD0287 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $150 Implemented
BD0287 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,661 $225 Implemented
BD0287 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,137 $1,500 Implemented
BD0287 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $9,255 $19,600 Implemented
BD0287 # 08 Y:2005 08 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $146 $0 Implemented
WI0205 # 01 Y:1994 01 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,212 $11,695 Implemented
WI0205 # 02 Y:1994 02 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,751 $15,000 Not Implemented
WI0205 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,651 $0 Not Implemented
WI0205 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $578 $1,000 Not Implemented
WI0205 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,492 Implemented
WI0205 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,578 $0 Implemented
WI0205 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $961 $450 Implemented
WI0205 # 08 Y:1994 08 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,321 $0 Not Implemented
WI0205 # 09 Y:1994 09 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,074 $500 Implemented
WI0205 # 10 Y:1994 10 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,362 $800 Implemented
WI0205 # 11 Y:1994 11 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $977 $500 Implemented
WI0205 # 12 Y:1994 12 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,370 $10,000 Not Implemented