Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 2542 | Partitions And Fixtures, Except Wood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0169 # 05 Y:2015 | 05 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $1,574 | $0 | Implemented |
MZ0169 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,080 | $7,000 | Implemented |
MZ0169 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $154 | $0 | Implemented |
MZ0169 # 02 Y:2015 | 02 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $209 | $300 | Not Implemented |
MZ0169 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,001 | $600 | Implemented |
MZ0164 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,600 | $384,000 | Implemented |
MZ0164 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $47,302 | $25,000 | Implemented |
MZ0164 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,200 | $1,430 | Implemented |
MZ0164 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,593 | $6,500 | Implemented |
MZ0164 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $24,203 | $100,000 | Implemented |
MZ0164 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $71,454 | $0 | Implemented |
MZ0164 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $1,744 | $1,500 | Not Implemented |
MZ0164 # 01 Y:2014 | 01 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $188,887 | $0 | Implemented |
KU0551 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,370 | $890 | Not Implemented |
KU0551 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $26,760 | $37,200 | Not Implemented |
KU0551 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $827 | $700 | Not Implemented |
KU0551 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,010 | $60 | Not Implemented |
KU0551 # 01 Y:2000 | 01 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $8,821 | $18,000 | Not Implemented |
KU0248 # 01 Y:1988 | 01 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $20,271 | $2,500 | Implemented |
KU0248 # 13 Y:1988 | 13 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $176 | $0 | Implemented |
KU0248 # 12 Y:1988 | 12 | 1988 | IMPROVE LUBRICATION PRACTICES | $275 | $0 | Implemented |
KU0248 # 11 Y:1988 | 11 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $451 | $450 | Not Implemented |
KU0248 # 10 Y:1988 | 10 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $545 | $850 | Implemented |
KU0248 # 09 Y:1988 | 09 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $40 | Implemented |
KU0248 # 08 Y:1988 | 08 | 1988 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $988 | $14 | Implemented |