IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2542 Partitions And Fixtures, Except Wood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0115 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,997 $0 Implemented
MI0115 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,775 $6,660 Implemented
MI0115 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,743 $4,732 Not Implemented
MI0115 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,435 $1,074 Implemented
MI0115 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $33,460 $2,314 Not Implemented
MI0115 # 01 Y:2005 01 2005 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $94,802 $420 Implemented
TA0097 # 07 Y:2005 07 2005 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,904 $0 Implemented
TA0097 # 06 Y:2005 06 2005 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,320 $50 Not Implemented
TA0097 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $2,486 $270 Not Implemented
TA0097 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,277 $0 Not Implemented
TA0097 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,341 $1,038 Implemented
TA0097 # 02 Y:2005 02 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,829 $176 Not Implemented
TA0097 # 01 Y:2005 01 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $8,253 $0 Implemented
BD0287 # 13 Y:2005 13 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $140 Implemented
BD0287 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $564 $600 Implemented
BD0287 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $568 $440 Not Implemented
BD0287 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
BD0287 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $894 $2,500 Implemented
BD0287 # 08 Y:2005 08 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $146 $0 Implemented
BD0287 # 07 Y:2005 07 2005 INSTALL TURBULATORS $1,486 $2,500 Not Implemented
BD0287 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $150 Implemented
BD0287 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,661 $225 Implemented
BD0287 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,137 $1,500 Implemented
BD0287 # 03 Y:2005 03 2005 USE RADIANT HEATER FOR SPOT HEATING $9,255 $19,600 Implemented
BD0287 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $12,300 $8,850 Not Implemented