Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,012
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0241 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,950 | $0 | n/a |
WM0241 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $96 | $368 | n/a |
WM0241 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,471 | $2,249 | n/a |
WM0241 # 02 Y:2025 | 02 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,959 | $6,000 | n/a |
WM0241 # 04 Y:2025 | 04 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $552 | $635 | n/a |
AS0604 # 06 Y:2025 | 06 | 2025 | INSTALL SPECTRAL REFLECTORS / DELAMP | $559 | $17 | n/a |
AS0604 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,514 | $46,000 | n/a |
AS0604 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,851 | $2,568 | n/a |
AS0604 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,160 | $515,135 | n/a |
AS0604 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $834 | $1,268 | n/a |
AS0604 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $215 | $315 | n/a |
AS0604 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $869 | $3,646 | n/a |
LE0590 # 11 Y:2025 | 11 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $173,183 | $1,591,750 | n/a |
LE0590 # 08 Y:2025 | 08 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,163 | $4,000 | n/a |
LE0590 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,020 | $3,696 | n/a |
LE0590 # 05 Y:2025 | 05 | 2025 | ELIMINATE A BY-PRODUCT | $24,310 | $16,420 | n/a |
LE0590 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,004 | $30,293 | n/a |
LE0590 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,681 | $301 | n/a |
LE0590 # 12 Y:2025 | 12 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,407 | $29,000 | n/a |
LE0590 # 09 Y:2025 | 09 | 2025 | REPLACE BOILER | $109,410 | $550,000 | n/a |
LE0590 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO HEAT WATER | $58,205 | $636,222 | n/a |
LE0590 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,163 | $4,000 | n/a |
LE0590 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,469 | $0 | n/a |
LE0590 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,450 | $1,980 | n/a |
NT0040 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,649 | $5,965 | n/a |