Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,622
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0075 # 06 Y:1986 | 06 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $789 | $800 | Implemented |
MA0075 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,134 | $1,075 | Implemented |
MA0075 # 08 Y:1986 | 08 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,014 | $7,500 | Implemented |
GT0301 # 03 Y:1986 | 03 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $385 | $800 | Implemented |
KU0210 # 01 Y:1986 | 01 | 1986 | IMPROVE LUBRICATION PRACTICES | $7,588 | $3,325 | Implemented |
KU0210 # 02 Y:1986 | 02 | 1986 | INSTALL SET-BACK TIMERS | $5,599 | $2,100 | Implemented |
KU0210 # 03 Y:1986 | 03 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,772 | $0 | Implemented |
KU0210 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $876 | $0 | Implemented |
KU0210 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $693 | $50 | Implemented |
KU0210 # 08 Y:1986 | 08 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $371 | $200 | Implemented |
KU0206 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,289 | $5,696 | Implemented |
KU0206 # 02 Y:1986 | 02 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,313 | $107 | Implemented |
KU0206 # 03 Y:1986 | 03 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,935 | $1,500 | Implemented |
KU0206 # 08 Y:1986 | 08 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $474 | $0 | Implemented |
KU0206 # 10 Y:1986 | 10 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Implemented |
KU0206 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $183 | $100 | Implemented |
KU0206 # 12 Y:1986 | 12 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $115 | $0 | Implemented |
MA0074 # 01 Y:1986 | 01 | 1986 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,075 | $1,200 | Implemented |
MA0074 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $158 | $100 | Implemented |
MA0074 # 03 Y:1986 | 03 | 1986 | IMPROVE LUBRICATION PRACTICES | $365 | $60 | Implemented |
MA0074 # 04 Y:1986 | 04 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $122 | $300 | Implemented |
MA0070 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $223 | $200 | Implemented |
MA0070 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $375 | Implemented |
KU0204 # 03 Y:1986 | 03 | 1986 | IMPROVE LUBRICATION PRACTICES | $2,017 | $1,600 | Implemented |
KU0204 # 04 Y:1986 | 04 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,220 | $700 | Implemented |