IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0075 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $800 Implemented
MA0075 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $1,075 Implemented
MA0075 # 08 Y:1986 08 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,014 $7,500 Implemented
GT0301 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $385 $800 Implemented
KU0210 # 01 Y:1986 01 1986 IMPROVE LUBRICATION PRACTICES $7,588 $3,325 Implemented
KU0210 # 02 Y:1986 02 1986 INSTALL SET-BACK TIMERS $5,599 $2,100 Implemented
KU0210 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,772 $0 Implemented
KU0210 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $876 $0 Implemented
KU0210 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $693 $50 Implemented
KU0210 # 08 Y:1986 08 1986 RECOVER WASTE HEAT FROM EQUIPMENT $371 $200 Implemented
KU0206 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,289 $5,696 Implemented
KU0206 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,313 $107 Implemented
KU0206 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,935 $1,500 Implemented
KU0206 # 08 Y:1986 08 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $474 $0 Implemented
KU0206 # 10 Y:1986 10 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $239 $0 Implemented
KU0206 # 11 Y:1986 11 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $183 $100 Implemented
KU0206 # 12 Y:1986 12 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $115 $0 Implemented
MA0074 # 01 Y:1986 01 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,075 $1,200 Implemented
MA0074 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $100 Implemented
MA0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $365 $60 Implemented
MA0074 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122 $300 Implemented
MA0070 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $200 Implemented
MA0070 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,470 $375 Implemented
KU0204 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $2,017 $1,600 Implemented
KU0204 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $1,220 $700 Implemented