IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0108 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $120 Implemented
TA0108 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,590 $0 Implemented
TA0108 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,530 $11,050 Implemented
UM0290 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,268 $11,077 Implemented
UM0290 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,868 $2,650 Implemented
UM0290 # 04 Y:2005 04 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,753 $6,230 Implemented
UM0290 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,296 $1,950 Implemented
UM0290 # 07 Y:2005 07 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $365 $720 Implemented
NC0322 # 01 Y:2005 01 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $139,400 $9,500 Implemented
NC0322 # 02 Y:2005 02 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $8,353 $2,650 Implemented
NC0322 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $573 $0 Implemented
NC0322 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,592 $821 Implemented
NC0322 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $100 Implemented
NC0322 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $723 $298 Implemented
NC0322 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $217 $2,000 Implemented
IA0371 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,255 $100 Implemented
IA0371 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $946 $25 Implemented
WI0497 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,445 $86,400 Implemented
WI0497 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,421 $0 Implemented
WI0497 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,656 $500 Implemented
WI0497 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $60 Implemented
SU0217 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,867 $0 Implemented
SU0217 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,819 $0 Implemented
SU0217 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,785 $500 Implemented
SU0217 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,763 $954 Implemented