Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0070 # 08 Y:2011 | 08 | 2011 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $21,528 | $52,000 | Implemented |
DL0070 # 06 Y:2011 | 06 | 2011 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $104,177 | $157,000 | Implemented |
DL0070 # 04 Y:2011 | 04 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $14,330 | $500 | Implemented |
DL0070 # 02 Y:2011 | 02 | 2011 | REDUCE VENTILATION AIR | $12,200 | $200 | Implemented |
DL0070 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $136,635 | $120,000 | Implemented |
DL0032 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,639 | $31,781 | Implemented |
DL0032 # 02 Y:2008 | 02 | 2008 | REDUCE VENTILATION AIR | $19,700 | $1,200 | Implemented |
DL0032 # 08 Y:2008 | 08 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $2,065 | $0 | Implemented |
DL0032 # 07 Y:2008 | 07 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,521 | $643 | Implemented |
DL0032 # 06 Y:2008 | 06 | 2008 | REPLACE BOILER | $6,100 | $6,100 | Implemented |
DL0032 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,400 | $7,500 | Implemented |
LE0211 # 01 Y:2005 | 01 | 2005 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $52,318 | $23,385 | Implemented |
LE0211 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,128 | $16,472 | Implemented |
RU0055 # 04 Y:1989 | 04 | 1989 | IMPROVE LUBRICATION PRACTICES | $2,844 | $800 | Implemented |
RU0055 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,194 | $4,800 | Implemented |
RU0053 # 06 Y:1989 | 06 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $509 | $168 | Implemented |
RU0053 # 04 Y:1989 | 04 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,276 | $0 | Implemented |
RU0052 # 07 Y:1989 | 07 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,620 | $0 | Implemented |
RU0052 # 04 Y:1989 | 04 | 1989 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,292 | $6,000 | Implemented |
RU0052 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,516 | $2,000 | Implemented |
RU0055 # 06 Y:1989 | 06 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,303 | $5,220 | Implemented |
RU0055 # 09 Y:1989 | 09 | 1989 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,933 | $0 | Implemented |
RU0055 # 10 Y:1989 | 10 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,364 | $0 | Implemented |
RU0038 # 05 Y:1988 | 05 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,757 | $0 | Implemented |
RU0038 # 02 Y:1988 | 02 | 1988 | INSTALL SET-BACK TIMERS | $6,581 | $0 | Implemented |