Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
175
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0612 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,865 | $8,523 | Implemented |
UF0612 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,735 | $34,020 | Implemented |
UF0612 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,068 | $30,945 | Implemented |
UF0612 # 03 Y:2024 | 03 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,994 | $20,000 | Implemented |
UF0612 # 08 Y:2024 | 08 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $7,481 | $5,900 | Implemented |
UF0612 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $13,749 | $3,750 | Implemented |
UF0612 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,066 | $2,320 | Implemented |
UF0557 # 07 Y:2020 | 07 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,282 | $25,340 | Implemented |
UF0557 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,870 | $8,850 | Implemented |
UF0557 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,993 | $25,529 | Implemented |
UF0557 # 01 Y:2020 | 01 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,350 | $150,000 | Implemented |
UF0557 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $33,607 | $165,000 | Implemented |
UF0557 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,904 | $455 | Implemented |
UF0557 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,548 | $2,336 | Implemented |
UF0557 # 08 Y:2020 | 08 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,710 | $5,998 | Implemented |
MI0288 # 10 Y:2015 | 10 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,706 | $1,300 | Implemented |
MI0288 # 11 Y:2015 | 11 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,333 | $80 | Implemented |
MI0288 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,939 | $91,936 | Implemented |
MI0288 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,212 | $1,670 | Implemented |
MI0288 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,840 | $4,691 | Implemented |
MI0288 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,388 | $40 | Implemented |
MI0224 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,668 | $80 | Implemented |
MI0224 # 06 Y:2012 | 06 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $996 | $2,594 | Implemented |
MI0224 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,660 | Implemented |
MI0224 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,323 | $3,480 | Implemented |