IAC logo
IAC Assessment: UF0612
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0612
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2024
Principal Product Corrugated Paperboard Containers
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 167,000
Annual Production 789,135 Units
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $399,518 5,751,871 kWh $0.07
Electricity Demand $153,859 12,569 kW-months/year $12.24
Electricity Fees $70,721 - $ -
Natural Gas $380,398 37,541 MMBtu $10.13
TOTAL ENERGY COSTS $1,055,160
RECOMMENDED SAVINGS* $603,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$402,389
Cost:
$1,529,500
$446,009 6,463,903 $146,892 12,000 $(-104,512) (-10,314) $(-86,000) - $446,009
6,463,903
kWh
$146,892
12,000
kW-months/year
$(-104,512)
(-10,314)
MMBtu
$(-86,000)
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$55,068
Cost:
$30,945
$39,688 575,187 $15,380 1,256 - - - - $39,688
575,187
kWh
$15,380
1,256
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$45,994
Cost:
$20,000
- - - - $45,994 4,539 - - -
-
kWh
-
-
kW-months/year
$45,994
4,539
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$44,735
Cost:
$34,020
$27,924 404,699 $16,811 1,373 - - - - $27,924
404,699
kWh
$16,811
1,373
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,865
Cost:
$8,523
$9,206 133,420 $4,659 381 - - - - $9,206
133,420
kWh
$4,659
381
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1222 INSTALL TURBULATORS Savings:
$13,749
Cost:
$3,750
- - - - $13,749 1,357 - - -
-
kWh
-
-
kW-months/year
$13,749
1,357
MMBtu
-
-
$
07: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$9,443
Cost:
$21,120
$9,443 136,853 - - - - - - $9,443
136,853
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$7,481
Cost:
$5,900
$7,481 108,415 - - - - - - $7,481
108,415
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,236
Cost:
$6,087
$5,236 75,882 - - - - - - $5,236
75,882
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$5,066
Cost:
$2,320
- - - - - - $5,066 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,066
-
$
TOTAL RECOMMENDED Savings:
$603,026
Cost:
$1,662,165
$544,987 7,898,359 $183,742 15,010 $(-44,769) (-4,418) $(-80,934) - $544,987
7,898,359
kWh
$183,742
15,010
kW-months/year
$(-44,769)
(-4,418)
MMBtu
$(-80,934)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes