Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
348
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1025 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $3,612 | $7,325 | Not Implemented |
UD1025 # 05 Y:2020 | 05 | 2020 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,710 | $5,224 | Not Implemented |
UD1025 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,963 | $26,366 | Not Implemented |
UD1025 # 10 Y:2020 | 10 | 2020 | INSTALL EQUIPMENT TO MOVE PRODUCT | $454,408 | $375,000 | Not Implemented |
UD1025 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,411 | $4,000 | Not Implemented |
UD1025 # 06 Y:2020 | 06 | 2020 | COMBINE UTILITY METERS | $8,278 | $0 | Not Implemented |
UD1025 # 09 Y:2020 | 09 | 2020 | INSTALL OCCUPANCY SENSORS | $11,875 | $4,845 | Not Implemented |
UD1025 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $83,809 | $25,133 | Not Implemented |
UD1025 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,747 | $0 | Not Implemented |
UD1025 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,051 | $340 | Implemented |
UD0964 # 03 Y:2017 | 03 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,847 | $500 | Not Implemented |
UD0964 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $652 | $500 | Not Implemented |
UD0964 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,083 | $0 | Not Implemented |
UD0964 # 09 Y:2017 | 09 | 2017 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,075 | $0 | Not Implemented |
UD0964 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,522 | $0 | Not Implemented |
UD0964 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,348 | $36,424 | Not Implemented |
UD0964 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,225 | $21,449 | Not Implemented |
UD0964 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,749 | $2,840 | Not Implemented |
UD0964 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,000 | $1,000 | Not Implemented |
UD0950 # 13 Y:2016 | 13 | 2016 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $7,880 | $0 | Implemented |
UD0950 # 06 Y:2016 | 06 | 2016 | REDUCE EXCESSIVE BOILER BLOWDOWN | $195 | $0 | Not Implemented |
UD0950 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,008 | $10,000 | Not Implemented |
UD0950 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,050 | $671 | Not Implemented |
UD0950 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $671 | $1,116 | Not Implemented |
UD0950 # 03 Y:2016 | 03 | 2016 | INSTALL TURBULATORS | $1,055 | $1,875 | Not Implemented |