IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

410

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0119 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,497 $1,250 Not Implemented
LE0119 # 04 Y:2001 04 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $19,921 $1,000 Implemented
LE0119 # 05 Y:2001 05 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,872 $18,500 Implemented
WV0221 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,200 $3,420 Implemented
WV0221 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $394 $60 Implemented
WV0221 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $8,016 $866 Implemented
WV0221 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $11,836 $8,422 Implemented
WV0221 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,579 $1,200 Implemented
WV0221 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,330 $3,980 Implemented
WV0221 # 07 Y:2001 07 2001 REPAIR OR REPLACE STEAM TRAPS $14,790 $1,000 Implemented
WV0221 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,986 $600 Implemented
WV0221 # 09 Y:2001 09 2001 RECYCLE FLUORESCENT LAMPS $3,048 $320 Not Implemented
WV0221 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,038 $2,000 Implemented
WV0221 # 11 Y:2001 11 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,000 $6,000 Not Implemented
WV0207 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $279,346 $353,018 Not Implemented
WV0207 # 02 Y:2001 02 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $24,920 $76,400 Not Implemented
WV0207 # 03 Y:2001 03 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,228 $9,955 Not Implemented
WV0207 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,889 $2,760 Implemented
WV0207 # 05 Y:2001 05 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,319 $36 Implemented
WV0207 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $536 $108 Implemented
WV0207 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,825 $54 Implemented
WV0207 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,703 $924 Not Implemented
WV0207 # 09 Y:2001 09 2001 RECOVER WASTE HEAT FROM EQUIPMENT $23,111 $3,360 Not Implemented
WV0207 # 10 Y:2001 10 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $706 $1,590 Not Implemented
WV0207 # 11 Y:2001 11 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,892 $6,990 Not Implemented