IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

443

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0520 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $835 Implemented
GT0520 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,900 $450 Implemented
GT0520 # 04 Y:1994 04 1994 REPAIR AND ELIMINATE STEAM LEAKS $3,845 $500 Implemented
GT0520 # 05 Y:1994 05 1994 USE MINIMUM STEAM OPERATING PRESSURE $2,350 $0 Not Implemented
GT0520 # 06 Y:1994 06 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,350 $0 Implemented
GT0520 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,750 $124,600 Not Implemented
MA0301 # 01 Y:1994 01 1994 REDUCE FLUID FLOW RATES $480,000 $657,000 Implemented
MA0301 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,698 $27,600 Not Implemented
MA0301 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,256 $4,383 Implemented
MA0301 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,228 $0 Implemented
MA0301 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,790 $1,236 Not Implemented
MA0301 # 06 Y:1994 06 1994 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $1,830 $5,906 Not Implemented
MA0301 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,277 $2,540 Not Implemented
SD0080 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,824 $60,230 Implemented
SD0080 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,011 $9,431 Implemented
SD0080 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,204 $300 Implemented
SD0080 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $21,874 $1,500 Not Implemented
SD0080 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,021 $220 Implemented
SD0080 # 06 Y:1994 06 1994 REPAIR AND ELIMINATE STEAM LEAKS $8,391 $300 Implemented
SD0080 # 07 Y:1994 07 1994 REPAIR OR REPLACE STEAM TRAPS $90,394 $5,000 Implemented
SD0080 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,743 $10,500 Not Implemented
SD0080 # 09 Y:1994 09 1994 REPAIR AND ELIMINATE STEAM LEAKS $13,168 $4,000 Implemented
SD0080 # 10 Y:1994 10 1994 USE MINIMUM STEAM OPERATING PRESSURE $2,032 $40 Implemented
SD0080 # 11 Y:1994 11 1994 USE POWER DURING OFF-PEAK PERIODS $12,571 $0 Implemented
SD0080 # 12 Y:1994 12 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $5,003 $250 Implemented