IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

521

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0195 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,324 $1,467 Implemented
SF0195 # 03 Y:2000 03 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $848 $1,200 Not Implemented
SF0195 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,297 $5,880 Implemented
SF0195 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,100 $3,250 Implemented
SF0195 # 06 Y:2000 06 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $124,556 $60,000 Not Implemented
SF0195 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,147 $10,300 Not Implemented
SF0195 # 08 Y:2000 08 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $27,873 $2,000 Not Implemented
SD0248 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,001 $40,000 Not Implemented
SD0248 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,837 $14,800 Implemented
SD0248 # 03 Y:2000 03 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,532 $7,536 Implemented
SD0248 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,585 $0 Implemented
SD0248 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,887 $4,950 Implemented
SD0248 # 06 Y:2000 06 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $5,300 $12,500 Not Implemented
SD0248 # 07 Y:2000 07 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,600 $1,000 Implemented
SD0248 # 08 Y:2000 08 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $743 $800 Not Implemented
SD0248 # 09 Y:2000 09 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,397 $8,500 Implemented
SD0248 # 10 Y:2000 10 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $70,500 $120,000 Not Implemented
SD0248 # 11 Y:2000 11 2000 INSTALL SYSTEM TO COLLECT SCRAP $13,426 $11,836 Implemented
SF0163 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,410 $0 Implemented
SF0163 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,591 $40 Implemented
SF0163 # 03 Y:1999 03 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,959 $2,110 Not Implemented
SF0163 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $267 $290 Implemented
SF0163 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,123 $18,120 Not Implemented
SF0163 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,092 $5,600 Not Implemented
SF0163 # 07 Y:1999 07 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $696 $0 Implemented