IAC logo
IAC Assessment: SF0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 200,000
Annual Production 0 Units
Production Hrs. Annual 5,904
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $357,424 3,832,953 kWh $0.09
TOTAL ENERGY COSTS $372,627
RECOMMENDED SAVINGS* $71,471 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,746
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,124
Cost:
-
- - $7,124 1,193 - - -
-
kWh
$7,124
1,193
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,874
Cost:
-
$5,874 47,809 - - - - $5,874
47,809
kWh
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,283
Cost:
$960
$4,283 32,413 - - - - $4,283
32,413
kWh
-
-
MMBtu
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,539
Cost:
$1,024
$1,539 10,976 - - - - $1,539
10,976
kWh
-
-
MMBtu
-
-
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,315
Cost:
$6,667
- - $8,315 1,298 - - -
-
kWh
$8,315
1,298
MMBtu
-
-
lb
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,732
Cost:
$16,065
- - $11,732 1,832 - - -
-
kWh
$11,732
1,832
MMBtu
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,405
Cost:
$58,318
$24,405 186,990 - - - - $24,405
186,990
kWh
-
-
MMBtu
-
-
lb
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$210
Cost:
$627
$210 1,585 - - - - $210
1,585
kWh
-
-
MMBtu
-
-
lb
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,489
Cost:
-
- - - - $3,489 - -
-
kWh
-
-
MMBtu
$3,489
-
lb
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,500
Cost:
$5,806
- - - - $4,500 - -
-
kWh
-
-
MMBtu
$4,500
-
lb
TOTAL RECOMMENDED Savings:
$71,471
Cost:
$89,467
$36,311 279,773 $27,171 4,323 $7,989 - $36,311
279,773
kWh
$27,171
4,323
MMBtu
$7,989
-
lb
TOTAL IMPLEMENTED Savings:
$50,746
Cost:
$66,009
$31,818 245,775 $15,439 2,491 $3,489 - $31,818
245,775
kWh
$15,439
2,491
MMBtu
$3,489
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)