IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

481

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0269 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,080 $500 Implemented
AM0269 # 05 Y:1996 05 1996 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $870 $0 Implemented
AM0269 # 06 Y:1996 06 1996 USE PHOTOCELL CONTROLS $240 $30 Implemented
AM0269 # 07 Y:1996 07 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $20,000 $975 Not Implemented
AM0269 # 08 Y:1996 08 1996 CLEAN FOULING FROM WATER LINES REGULARLY $100 $100 Not Implemented
KG0028 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,738 $1,050 Implemented
KG0028 # 02 Y:1995 02 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,629 $0 Not Implemented
KG0028 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,216 $1,102 Not Implemented
KG0028 # 04 Y:1995 04 1995 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,953 $0 Not Implemented
KG0028 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,100 $3,090 Implemented
AM0240 # 01 Y:1995 01 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,230 $0 Implemented
AM0240 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,860 $40 Implemented
AM0240 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,340 $1,570 Implemented
AM0240 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $870 $170 Implemented
AM0240 # 05 Y:1995 05 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $780 $0 Implemented
AM0240 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $670 $835 Implemented
AM0240 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $1,960 Implemented
AM0240 # 08 Y:1995 08 1995 USE SYNTHETIC LUBRICANT $610 $0 Implemented
AM0240 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $500 Implemented
KG0016 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,950 $20,870 Implemented
KG0016 # 02 Y:1995 02 1995 INSTALL TIMERS AND/OR THERMOSTATS $7,434 $1,200 Implemented
KG0016 # 03 Y:1995 03 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,593 $2,685 Not Implemented
KG0016 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $882 Implemented
KG0016 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,255 $15 Not Implemented
KG0016 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,857 $178 Not Implemented