Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0642 # 09 Y:2002 09 2002 MODIFY WORKLOAD $35,955 $0 Not Implemented
OK0642 # 08 Y:2002 08 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $245,550 $11,639 Not Implemented
OK0642 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $446 $0 Implemented
OK0642 # 06 Y:2002 06 2002 INSTALL SET-BACK TIMERS $2,130 $332 Implemented
OK0642 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $711 $450 Not Implemented
OK0642 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $15,836 Not Implemented
OK0642 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,265 $10 Implemented
OK0642 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $900 Implemented
OK0642 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,760 $9,780 Implemented
OK0585 # 09 Y:1999 09 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,045 $0 n/a
OK0585 # 01 Y:1999 01 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,155 $2,668 n/a
OK0585 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $-1,464 $4,300 n/a
OK0585 # 08 Y:1999 08 1999 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $147,498 $25,000 n/a
OK0585 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,788 $0 n/a
OK0585 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,121 $1,162 n/a
OK0585 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $360 n/a
OK0585 # 06 Y:1999 06 1999 INSTALL SET-BACK TIMERS $507 $260 n/a
OK0585 # 07 Y:1999 07 1999 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $45,623 $17,000 n/a
OK0513 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,003 $1,048 Implemented
OK0513 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $46,860 $72,000 Implemented
OK0513 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,226 $9,259 Not Implemented
OK0513 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $3,859 $0 Not Implemented
OK0513 # 03 Y:1997 03 1997 REPAIR AND ELIMINATE STEAM LEAKS $27,432 $3,300 Implemented
OK0513 # 05 Y:1997 05 1997 INSTALL SET-BACK TIMERS $331 $126 Not Implemented
OK0513 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,233 $343 Implemented