IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0169 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,505 $1,115 Not Implemented
UA0169 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,365 $100 Not Implemented
UA0169 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $753 $2,700 Implemented
UA0169 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $537 $415 Not Implemented
UA0169 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $100 Not Implemented
UA0167 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $37,832 $3,743 Not Implemented
UA0167 # 02 Y:2016 02 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,023 $38,992 Not Implemented
UA0167 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,195 $35,575 Implemented
UA0167 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,865 $264 Not Implemented
UA0167 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $4,765 Not Implemented
UA0167 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,424 $250 Not Implemented
UA0167 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,125 $4,435 Not Implemented
UA0167 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $575 $2,874 Not Implemented
UA0167 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $463 $150 Not Implemented
AM0714 # 01 Y:2016 01 2016 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $124,166 $178,260 Not Implemented
AM0714 # 02 Y:2016 02 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $30,947 $15,000 Implemented
AM0714 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $11,140 $13,490 Not Implemented
AM0714 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,435 $1,000 Implemented
AM0714 # 05 Y:2016 05 2016 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,800 $0 Not Implemented
AM0714 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,555 $4,700 Not Implemented
AM0714 # 07 Y:2016 07 2016 DISCONNECT BALLASTS $650 $0 Not Implemented
AM0714 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $330 $0 Not Implemented
AM0714 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $730 Not Implemented
BS0075 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,685 $1,464 Implemented
BS0075 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $502 Implemented