IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0066 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,586 $2,100 Not Implemented
HO0066 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,470 $10,000 Not Implemented
UD0423 # 01 Y:1994 01 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,774 $50,000 Implemented
UD0423 # 02 Y:1994 02 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $62,721 $150,000 Not Implemented
UD0423 # 03 Y:1994 03 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,236 $30,000 Implemented
UD0423 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,024 $400 Implemented
UD0423 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $17,559 $10,000 Not Implemented
UD0423 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
UF0082 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $907 $1,527 Not Implemented
UF0082 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $917 $2,370 Not Implemented
UF0082 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $308 $100 Not Implemented
UF0082 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,183 $2,250 Not Implemented
UF0082 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,957 $542 Implemented
IA0074 # 01 Y:1994 01 1994 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $330,256 $54,545 Not Implemented
IA0074 # 02 Y:1994 02 1994 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $55,254 $8,200 Not Implemented
IA0074 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $3,511 $1,800 Implemented
IA0074 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,641 $1,900 Implemented
IA0074 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $9,807 $12,405 Implemented
IA0074 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,912 $1,932 Not Implemented
IA0074 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $2,111 $1,297 Not Implemented
IA0074 # 08 Y:1994 08 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,720 $25 Not Implemented
IA0074 # 09 Y:1994 09 1994 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,017 $1,192 Not Implemented
UF0079 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,254 $1,557 Implemented
UF0079 # 02 Y:1994 02 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $924 $1,088 Implemented
UF0079 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $279 $0 Not Implemented