IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0061 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,891 $4,866 Not Implemented
UF0061 # 07 Y:1993 07 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,081 $0 Not Implemented
UF0061 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $290 $134 Implemented
UF0061 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,623 $1,440 Implemented
UF0061 # 10 Y:1993 10 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $133 $50 Not Implemented
UF0061 # 11 Y:1993 11 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $719 $2,846 Not Implemented
AM0180 # 01 Y:1993 01 1993 OPERATE DISTILLATION COLUMNS EFFICIENTLY $3,360 $13,900 Not Implemented
AM0180 # 02 Y:1993 02 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,570 $1,515 Not Implemented
AM0180 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,650 $0 Not Implemented
AM0180 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $755 $400 Implemented
AM0180 # 05 Y:1993 05 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $1,115 Implemented
MO0082 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,825 $31,211 Implemented
MO0082 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,474 $1,430 Implemented
MO0082 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,548 $554 Not Implemented
MO0082 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,256 $45,107 Implemented
MO0082 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,980 $2,627 Implemented
MO0082 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,722 $790 Not Implemented
MO0082 # 07 Y:1993 07 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,845 $60 Implemented
MO0082 # 08 Y:1993 08 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,296 $1,695 Not Implemented
ND0149 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,563 $759 Implemented
ND0149 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,224 $266 Not Implemented
ND0149 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,014 $500 Implemented
ND0149 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,210 $2,430 Not Implemented
ND0149 # 05 Y:1993 05 1993 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,427 $12,000 Not Implemented
MA0264 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,121 $9,386 Implemented