IAC logo
IAC Assessment: AS0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product SANITARY PAPER PRODUCTS
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 74
Plant Area (Sq.Ft.) 0
Annual Production 31,000 Tons
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,878,760 30,515,827 kWh $0.06
Natural Gas $936,139 287,804 MMBtu $3.25
TOTAL ENERGY COSTS $2,814,899
RECOMMENDED SAVINGS* $71,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,854
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,038
Cost:
$13,000
- - $13,038 4,012 - - -
-
kWh
$13,038
4,012
MMBtu
-
-
$
02: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$6,174
Cost:
$1,463
- - $6,174 1,900 - - -
-
kWh
$6,174
1,900
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$13,102
Cost:
$3,208
- - $13,102 4,031 - - -
-
kWh
$13,102
4,031
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,632
Cost:
$5,588
$6,632 107,855 - - - - $6,632
107,855
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,958
Cost:
-
$14,958 242,966 - - - - $14,958
242,966
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,245
Cost:
-
$4,443 72,098 - - $(-198) - $4,443
72,098
kWh
-
-
MMBtu
$(-198)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$124
Cost:
$678
$124 2,052 - - - - $124
2,052
kWh
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,164
Cost:
$7,175
$4,164 67,702 - - - - $4,164
67,702
kWh
-
-
MMBtu
-
-
$
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$8,795
Cost:
$2,025
$8,795 143,025 - - - - $8,795
143,025
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$71,232
Cost:
$33,137
$39,116 635,698 $32,314 9,943 $(-198) - $39,116
635,698
kWh
$32,314
9,943
MMBtu
$(-198)
-
$
TOTAL IMPLEMENTED Savings:
$47,854
Cost:
$22,474
$21,714 352,873 $26,140 8,043 - - $21,714
352,873
kWh
$26,140
8,043
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes