IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0376 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,699 $0 Implemented
KU0376 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,481 $0 Not Implemented
KU0376 # 09 Y:1992 09 1992 INSTALL TURBULATORS $1,195 $1,087 Not Implemented
KU0376 # 10 Y:1992 10 1992 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $2,876 $8,000 Not Implemented
KU0376 # 11 Y:1992 11 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,686 $30,000 Implemented
KU0376 # 12 Y:1992 12 1992 INSULATE BARE EQUIPMENT $4,572 $3,450 Not Implemented
KU0376 # 13 Y:1992 13 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $520 $185 Not Implemented
KU0376 # 14 Y:1992 14 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,826 $3,200 Implemented
KU0376 # 15 Y:1992 15 1992 REPAIR AND ELIMINATE STEAM LEAKS $1,201 $120 Implemented
KU0376 # 16 Y:1992 16 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $721 $2,550 Not Implemented
KU0376 # 17 Y:1992 17 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8 $420 Not Implemented
OR0147 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,344 $0 Implemented
OR0147 # 02 Y:1992 02 1992 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $125,990 $0 Not Implemented
OR0147 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,776 $19,623 Implemented
OR0147 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,227 $6,838 Implemented
OR0147 # 05 Y:1992 05 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,829 $150,050 Not Implemented
KU0374 # 01 Y:1992 01 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,932 $3,705 Not Implemented
KU0374 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $2,477 $0 Implemented
KU0374 # 03 Y:1992 03 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,925 $4,800 Not Implemented
KU0374 # 04 Y:1992 04 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,651 $1,785 Implemented
KU0374 # 05 Y:1992 05 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $602 $1,066 Implemented
KU0374 # 06 Y:1992 06 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $403 $0 Not Implemented
KU0374 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $327 $0 Not Implemented
GT0466 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,501 $21,760 Not Implemented
GT0466 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $848 $100 Not Implemented