IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0226 # 11 Y:1987 11 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $422 $1,600 Not Implemented
KU0226 # 12 Y:1987 12 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $204 $0 Not Implemented
KU0226 # 13 Y:1987 13 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $170 $0 Not Implemented
KU0226 # 14 Y:1987 14 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $136 $0 Implemented
GT0317 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,870 $40,461 Not Implemented
GT0317 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,989 $6,975 Implemented
GT0317 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $866 $691 Not Implemented
GT0317 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $3,745 $4,100 Implemented
GT0317 # 05 Y:1987 05 1987 REPAIR AND ELIMINATE STEAM LEAKS $1,040 $200 Implemented
TN0305 # 01 Y:1987 01 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,479 $0 Implemented
TN0305 # 02 Y:1987 02 1987 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,347 $120 Not Implemented
TN0305 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $210 Implemented
TN0305 # 04 Y:1987 04 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,592 $1,315 Not Implemented
TN0305 # 05 Y:1987 05 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,297 $0 Not Implemented
TN0305 # 06 Y:1987 06 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,034 $348 Implemented
TN0305 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $120 Implemented
UD0226 # 01 Y:1987 01 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,972 $2,565 Implemented
UD0226 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,458 $30,000 Not Implemented
UD0226 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,151 $1,232 Implemented
UD0226 # 04 Y:1987 04 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,040 $24,000 Implemented
UD0226 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,236 $0 Not Implemented
CO0062 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,721 $40 Implemented
CO0062 # 02 Y:1986 02 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,638 $9,200 Implemented
CO0062 # 03 Y:1986 03 1986 USE RADIANT HEATER FOR SPOT HEATING $7,549 $15,000 Not Implemented
CO0062 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,765 $3,300 Not Implemented