Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,067
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0045 # 07 Y:2025 | 07 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,694 | $5,000 | n/a |
CI0045 # 08 Y:2025 | 08 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,247 | $910 | n/a |
AS0604 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $215 | $315 | n/a |
AS0604 # 06 Y:2025 | 06 | 2025 | INSTALL SPECTRAL REFLECTORS / DELAMP | $559 | $17 | n/a |
AS0604 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $834 | $1,268 | n/a |
AS0604 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $869 | $3,646 | n/a |
AS0604 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,851 | $2,568 | n/a |
AS0604 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,514 | $46,000 | n/a |
AS0604 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,160 | $515,135 | n/a |
LE0590 # 12 Y:2025 | 12 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,407 | $29,000 | n/a |
LE0590 # 11 Y:2025 | 11 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $173,183 | $1,591,750 | n/a |
LE0590 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,004 | $30,293 | n/a |
LE0590 # 09 Y:2025 | 09 | 2025 | REPLACE BOILER | $109,410 | $550,000 | n/a |
LE0590 # 08 Y:2025 | 08 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,163 | $4,000 | n/a |
LE0590 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,163 | $4,000 | n/a |
LE0590 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO HEAT WATER | $58,205 | $636,222 | n/a |
LE0590 # 05 Y:2025 | 05 | 2025 | ELIMINATE A BY-PRODUCT | $24,310 | $16,420 | n/a |
LE0590 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,020 | $3,696 | n/a |
LE0590 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,450 | $1,980 | n/a |
LE0590 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,681 | $301 | n/a |
LE0590 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,469 | $0 | n/a |
NT0040 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $3,165 | $5,000 | Not Implemented |
NT0040 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,649 | $5,965 | Not Implemented |
NT0040 # 03 Y:2025 | 03 | 2025 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $150,000 | $12,000 | Not Implemented |
NT0040 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,568 | $5,609 | Not Implemented |