Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
8,012
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0206 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $183 | $100 | Implemented |
KU0206 # 12 Y:1986 | 12 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $115 | $0 | Implemented |
MA0070 # 01 Y:1986 | 01 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,611 | $0 | Not Implemented |
MA0070 # 02 Y:1986 | 02 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $223 | $200 | Implemented |
MA0070 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,470 | $375 | Implemented |
MA0070 # 04 Y:1986 | 04 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,575 | $5,300 | Not Implemented |
MA0070 # 05 Y:1986 | 05 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $1,072 | $2,000 | Not Implemented |
KU0205 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,437 | $2,317 | Implemented |
KU0205 # 02 Y:1986 | 02 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,717 | $1,000 | Implemented |
KU0205 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,773 | $150 | Implemented |
KU0205 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,162 | $615 | Not Implemented |
KU0205 # 05 Y:1986 | 05 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,085 | $1,500 | Not Implemented |
KU0205 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $648 | $0 | Implemented |
KU0205 # 07 Y:1986 | 07 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $396 | $0 | Not Implemented |
KU0204 # 01 Y:1986 | 01 | 1986 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $50,936 | $300,000 | Not Implemented |
KU0204 # 02 Y:1986 | 02 | 1986 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $8,720 | $3,000 | Not Implemented |
KU0204 # 03 Y:1986 | 03 | 1986 | IMPROVE LUBRICATION PRACTICES | $2,017 | $1,600 | Implemented |
KU0204 # 04 Y:1986 | 04 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $1,220 | $700 | Implemented |
KU0204 # 05 Y:1986 | 05 | 1986 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $715 | $0 | Implemented |
KU0204 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $335 | $0 | Implemented |
KU0204 # 07 Y:1986 | 07 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $732 | $30 | Implemented |
KU0204 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $576 | $50 | Implemented |
KU0204 # 09 Y:1986 | 09 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $155 | $100 | Implemented |
KU0204 # 10 Y:1986 | 10 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $126 | $0 | Not Implemented |
UD0201 # 01 Y:1986 | 01 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,240 | $0 | Implemented |