Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0697 # 03 Y:2012 | 03 | 2012 | IMPROVE COMBUSTION CONTROL CAPABILITY | $23,122 | $100,000 | Not Implemented |
MA0697 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $10,370 | $3,000 | Implemented |
MA0697 # 05 Y:2012 | 05 | 2012 | PAY UTILITY BILLS ON TIME | $11,678 | $500 | Implemented |
MA0697 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,779 | $3,600 | Implemented |
MA0697 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,452 | $8,700 | Not Implemented |
MA0697 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $659 | $500 | Not Implemented |
WM0003 # 01 Y:2012 | 01 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,254 | $600 | Implemented |
WM0003 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $2,091 | $0 | Not Implemented |
WM0003 # 03 Y:2012 | 03 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,223 | $0 | Not Implemented |
WM0003 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $226 | $120 | Implemented |
WM0003 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $137 | $360 | Implemented |
WM0003 # 06 Y:2012 | 06 | 2012 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $493 | $99 | Not Implemented |
WM0003 # 07 Y:2012 | 07 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,160 | $900 | Not Implemented |
UMS009 # 01 Y:2012 | 01 | 2012 | CLOSE OFF UNNEEDED STEAM LINES | $3,138,000 | $4,845,000 | Not Implemented |
TT0093 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,234 | $10,343 | Not Implemented |
TT0093 # 02 Y:2012 | 02 | 2012 | INSTALL WIND POWERED ELECTRIC GENERATOR | $29,491 | $250,000 | Not Implemented |
TT0093 # 03 Y:2012 | 03 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,625 | $52,000 | Implemented |
TT0093 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,350 | $800 | Implemented |
TT0093 # 05 Y:2012 | 05 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,014 | $7,685 | Implemented |
MI0224 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,266 | $11,960 | Implemented |
MI0224 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $14,666 | $2,135 | Not Implemented |
MI0224 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,947 | $12,324 | Implemented |
MI0224 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,323 | $3,480 | Implemented |
MI0224 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,660 | Implemented |
MI0224 # 06 Y:2012 | 06 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $996 | $2,594 | Implemented |