Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0157 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,162 | $4,848 | Implemented |
IC0157 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,780 | $9,923 | Implemented |
IC0157 # 04 Y:2009 | 04 | 2009 | INSULATE BARE EQUIPMENT | $769 | $470 | Not Implemented |
IC0157 # 05 Y:2009 | 05 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,159 | $1,572 | Not Implemented |
IC0157 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $968 | $1,964 | Implemented |
IC0157 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,603 | $805 | Implemented |
IC0157 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,436 | $1,524 | Implemented |
IC0157 # 09 Y:2009 | 09 | 2009 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,416 | $210 | Not Implemented |
IC0157 # 10 Y:2009 | 10 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,332 | $0 | Not Implemented |
IC0157 # 11 Y:2009 | 11 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $162,607 | $289,000 | Implemented |
IC0157 # 12 Y:2009 | 12 | 2009 | DISCONNECT BALLASTS | $4,133 | $1,070 | Implemented |
NC0390 # 01 Y:2009 | 01 | 2009 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $46,662 | $67,500 | Not Implemented |
NC0390 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $871 | $100 | Implemented |
NC0390 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,075 | $0 | Not Implemented |
NC0390 # 04 Y:2009 | 04 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,533 | $50 | Implemented |
NC0390 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $379 | $432 | Not Implemented |
NC0390 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,223 | $50,369 | Not Implemented |
LE0286 # 01 Y:2009 | 01 | 2009 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $20,166 | $9,360 | Not Implemented |
LE0286 # 02 Y:2009 | 02 | 2009 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $15,000 | $40,000 | Not Implemented |
LE0286 # 03 Y:2009 | 03 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,875 | $10,000 | Not Implemented |
LE0286 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,170 | $1,152 | Not Implemented |
LE0286 # 05 Y:2009 | 05 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,022 | $800 | Not Implemented |
LE0286 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,998 | $192 | Implemented |
LE0286 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,833 | $350 | Implemented |
LE0286 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,174 | $100 | Implemented |