Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0037 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,571 | $2,500 | Implemented |
UA0037 # 07 Y:2009 | 07 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $17,492 | $25,930 | Not Implemented |
UA0037 # 08 Y:2009 | 08 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,174 | $32,445 | Implemented |
UA0037 # 09 Y:2009 | 09 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,938 | $6,000 | Implemented |
UA0037 # 10 Y:2009 | 10 | 2009 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $836 | $0 | Implemented |
UA0037 # 11 Y:2009 | 11 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $7,231 | $16,448 | Not Implemented |
UA0037 # 12 Y:2009 | 12 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $16,135 | $1,700 | Implemented |
UW0027 # 01 Y:2009 | 01 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,632 | $10,324 | Not Implemented |
UW0027 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,650 | $37,000 | Not Implemented |
UW0027 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $5,716 | $871 | Not Implemented |
UW0027 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,168 | $2,280 | Implemented |
UW0027 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
IC0155 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $338 | $525 | Implemented |
IC0155 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,751 | $32,000 | Implemented |
IC0155 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $7,147 | $6,214 | Implemented |
IC0155 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,354 | $112,227 | Implemented |
IC0155 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,637 | $2,750 | Implemented |
IC0155 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $576 | $0 | Not Implemented |
IC0155 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,086 | $1,265 | Not Implemented |
IC0155 # 08 Y:2009 | 08 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,037 | $0 | Not Implemented |
TT0031 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $852 | $850 | Implemented |
TT0031 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,178 | $480 | Implemented |
TT0031 # 03 Y:2009 | 03 | 2009 | USE PHOTOCELL CONTROLS | $23,587 | $55,000 | Implemented |
TT0031 # 04 Y:2009 | 04 | 2009 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $10,527 | $36,300 | Not Implemented |
DL0032 # 01 Y:2008 | 01 | 2008 | REPLACE BOILER | $30,400 | $55,000 | Not Implemented |