IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,012

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0225 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,399 $15,200 Implemented
UU0225 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,851 $2,775 Implemented
UL2306 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,019 $0 Not Implemented
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2306 # 03 Y:2023 03 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,595 $12,891 Not Implemented
UL2306 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,055 $314,019 Not Implemented
UL2306 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $103,804 $14,859 Not Implemented
CC0018 # 01 Y:2023 01 2023 INSULATE FEEDWATER TANK $2,497 $500 n/a
CC0018 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,506 $10,000 n/a
CC0018 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,158 $10,000 n/a
CC0018 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $0 n/a
CC0018 # 05 Y:2023 05 2023 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,265 $70,000 n/a
CC0018 # 06 Y:2023 06 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $95,279 $350,000 n/a
UA0272 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $10,163 $4,516 Not Implemented
UA0272 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,415 $5,352 Implemented
UA0272 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,741 $1,120 Not Implemented
UA0272 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $6,577 $7,065 Not Implemented
NL0079 # 01 Y:2023 01 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,717 $54,394 Implemented
NL0079 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,509 $4,500 Implemented
NL0079 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,699 $10,600 Implemented
NL0079 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,949 $768 Implemented
NL0079 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,292 $128 Implemented
NL0079 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,953 $392 Implemented
NL0079 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,356 $2,892 Implemented
NL0079 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $2,875 Implemented